Back to start

Goirle

Goirle
The solar park is located south of Tilburg, near the border with Belgium.

The municipality of Goirle wants to be a low-carbon municipality by 2050 with 80% less CO emissions than in 2014. To achieve this goal, the municipality wants to generate more electricity through solar and wind energy. Solar park Goirle with a capacity of 15 MW contributes to this.

Vattenfall has taken the initiative to develop this solar park between the road Gorps Baantje, the fruit farm De Braacken and the forest.

More information (links open in new window)